SRG has completed
the adaptive re-use study of a former church complex for the Schenectady
Light Opera Company's new Center for the Performing Arts. A study
of existing conditions of all buildings was completed for structural,
HVAC systems, etc. and a site plan, concept designs, recommendations
for utilization of the buildings and an estimate of probable costs
were included.
Our Team is
currently performing the first phase of work -- the Lobby Infill
design. This project will connect two of the buildings and provide
a grand entrance to the theatre.
|